Industrial Projects



S. Kanetzky Engineering, LLC has worked on a number of industrial projects, including the following:

City of Leakey
Location: Leakey, Texas
Project Description: Construction of a new 0.25 MGD sequencing batch reactor wastewater treatment plant south of Leakey in Real County, Texas. The plant includes a control building, influent structure, chlorine contact tank, and dewatering bins. Electrical design for the 7 lift stations as well. 

City of Floresville
Location: Floresville, Texas
Project Description: Electrical and I&C design for a wastewater treatment

plant and two new lift stations.

Manville Water Supply Corporation

Location: Coupland, Texas
Project Description: The project included the expansion of the existing
Tonka Filter Plant from 4 MGD to 10 MGD.

 

Marble Falls Quarry

Location: Marble Falls, Texas
Project Description: This project provided electrical engineering services for the expansion of the existing Marble Falls Quarry. The project consisted of fieldwork to verify and document the existing conditions, demolition of the existing power distribution, and the installation of new 12.47 kV and 480V power distribution to the plant.

 


Ramming Companies - Five Sites

Location: Central Texas (Hayes Quarries, Buda, Mustang Ridge)

Project Description: Performed arc flash studies for all 5 plant sites.

Capitol Aggregates
Location: Austin, Texas

Project Description: Design review for power factor correction capacitors.

Taylor Lane Wastewater Treatment Plant
Location: Austin, Texas
Project Description: The project included the electrical and instrumentation
design for a new 0.1 MGD average capacity wastewater treatment plant with a new lift station.

City of Pharr
Location: Pharr, Texas
Project Description: The project included the expansion of the existing 10 MGD to 19 MGD water treatment plant.


Manville Water Supply Corporation – Lee County Wells
Location: Coupland, Texas
Project Description: The project included the electrical and SCADA design for 4 new 200 HP submersible wells with standby generators.

 

City of Los Fresnos
​Location: Los Fresnos, Texas
Project Description: The project included the electrical and instrumentation design for nine new duplex lift stations.


City of Los Fresnos Wastewater Treatment Plant
Location: Los Fresnos, Texas
Project Description: The project included the electrical and instrumentation design for a new wastewater treatment plant.


City of Seguin – Various Lift Stations
Location: Seguin, Texas
Project Description: The project included the electrical, instrumentation, standby generator, and SCADA design for a duplex pump lift station.

Southwest Milam WSC

Location: Rockdale, Texas
Project Description: Electrical sudy for power factor correction.

 

1/11

© 2017 S. Kanetzky Engineering, LLC.