© 2017 S. Kanetzky Engineering, LLC.

Government Projects



Demonstrating their faith in our work, S. Kanetzky has been contracted for a variety of government projects including:
 

TxDOT - URPs Replacement, Camp Hubbard Building 6

Location: Austin, TX

Project Description: Electrical Design to replace existing rotary UPS: WA1, SWA1.

TxDOT- Statewide Arc Flash Study
Location: Texas            

Project Description: Arc flash studies for typical traffic signal site.

Fort Hood – Women’s Health Clinic    
Location: Killeen, TX             

Project Description: Boiler and air-cooled chiller design
 

City of Rockport Public Safety Center
Location: Rockport, TX
Project Description: The project included an electrical assessment report for the Public Safety Center electrical distribution system, grounding system, and surge protection system. The project also included a Phase I Electrical Assessment Report.

 

Fort Hood – Carl R. Darnall Army Medical Center
Location: Killeen, TX             

Project Description: SKE was tasked to decommission the Medical Center so it could be repurposed into medical offices.  The design entailed the removal of all medical components that make it a hospital, including the infrastructure to supply medical gas,
major equipment such as MRI, CTs, X-ray machines, and operating rooms and laboratories.

Billy Johnson Dental Clinic - Carl R. Darnall Army Medical Center

Location: Fort Hood, Texas

Project Description: Replace 4 air handling units and four return air fans.

City of Presidio Booster Plant Station Genset
Location: Presidio, TX
Project Description: Created schematic design for new utility power, SCADA,
lighting ATS and generator.

1/4

City of Dripping Springs Events Arena
Location: Dripping Springs
, TX
Project Description: MEP design of new arena, including HVAC, kitchen ductwork and mechanical design, fire suppression, plumbing, lighting and power system design, electrical service and distribution.